Modern Fast Building Quakeproof Prefabricated Steel Structure for Sports Hall Gym
Specification
Steel Structure | Fuction | Material | Surface Finish | Design |
Frame | wind resistance/anti-fire/bearing weight | H-section column ,C-section purlin, welded H-style beam | prepainted/galvanized/ | customized |
Roof & wall panel | Insulation/water-proof/fire resistance/wind-resistance | sandwich panel(EPS/rock wool/PU/glass wool)/steel sheet | galvanized/galvalum/color coated | corrugated/flat |
thickness of sandwich panel(50mm/75mm/100mm/150mm) thickness of steel plate:1.0mm/1.5mm |
window | daylight/air circulation/decoration | pvc steel /aluminum alloy/glass | customized | sliding/roll-up |
Door | security/insulation/water-proof | steel sheet/sandwich | prepainted/galvanized | Sliding/rolling up |
Accessory | self-locked nail, steel bracket, high strength bolts, self-drilling screw, rivet, inter and outer cullis, rainspout, trimming sheet, glass cemen |
Life span | >50 years |
Feature | Multi-functional | perfect for workshop/warehouse/power plant/cafe/exhibition hall/GYM/Concert hall/car -parking/4s shops/logistics/etc |
Reusable | 100% light steel structure material can be reused. |
Wide span | the max span is 36m without middle column |
fast construction | prefabricated unit component |
stable and durable | excellent anti-quake effects |
Cost-effective | half of the cost of common contruction system |
enlarge the space | make the most use of the property of steel structure |
perfect combination between mechanical property and art | Different plan based on different requirements |
considerate design | CAD Drawing and other software |
Advantage
1. High quality, strong, durability and stability, aesthetic
2.Modularization-specific design
3.Fast and easy erection and installation
4.Cheaper, lower maintenance cost than any other construction method
5.Good waterproof and flameproof
6. Nonshrinking and noncreeping at ambient temperature
7. Termiteproof and proof
8. Environmentally friendly, steel and components can be re-used without effectiong the environment
9. Subtantial elimination of delays due to weather
10. Uniform quality
11.Economy in transportation and handling
Process flow of steel structure fabrication
Cutting → Preassembling → Welding → Straightening → Drilling → Final Assembling → Sand Blasting → Painting
Packaging & Shipping:
1. Professional design and engineering team:
Full solution for site camp design. We could make the design for whole camp as per your requirement.
2. Procurement and Manufacture for all material for prefabricated building:
We have a professional procurement team to make sure all the materials are with good quality. And our factory operation under ISO/CE/SGS standard, to make sure the fabrication works with high technology.
3. Site management & Installation supervision:
We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK
Related Products
Tag:
steel frame buildings,
pre engineered steel buildings,
pre manufactured steel buildings